left the house at 8.10 again today, and as i arrived at the bus stop i saw the bus left so i decided to take another route that said 30mins which involved changing 2 buses and ended up reaching only at 9.30am. next time even if i missed the bus i m going to just stand there and wait.
a new term i learn today for the NRP(neighbourhood renewal program) is the ELU(Electrical load upgrading). This upgrades the loading from existing 30amp to 40 amp now. It seems mainly that HDB after 1994, are already 40amp.
Firstly after googling Amps is like the volume of water in a pipe, and Volts is like the pressure of the water, and Watts is like the power of (Volts x Amps).
http://www.todayonline.com/singapore/hdb-carry-out-electrical-upgrading-4000-more-older-blocks
Another thing is that when suggested movement of services. Existing appliances and view to all adjacent buildings should . ( Typed when sleepy)
time to zzzZ
Tuesday, 15 August 2017
Subscribe to:
Post Comments (Atom)
Last days of June
Haven't cycled sinced March, when L left, and the bicycle was packed in the bag. to midyear, thats 3 months. probably the period that i...
-
Eventful day, started at 9am when S came around to pick us all in sequence. Public consultation was at Pasir Ris block 614 and then the oth...
-
TextAlign Tool Aligns it to specific pt or distance. either by aligning the selected one to the last one. or by clicking options, the ...
-
Today is about Ground Gardens and Sky Terraces and what encourages their proliferation in our city. In the same way that if there isn't...
No comments:
Post a Comment