The Pc arrived at about 4pm as a rehabiliated CPU so when booted up had alot of software in it.
my first assignment is to design 4 substations.
the office is clean spacious, and habited. the toilet as left to the original is a little scary with an open shelf and detergent bottles strewn all over.
left at 5.45pm to go for the dFMA class at bca, it was nice to have the sun on my face.
No comments:
Post a Comment