The Pc arrived at about 4pm as a rehabiliated CPU so when booted up had alot of software in it.
my first assignment is to design 4 substations.
the office is clean spacious, and habited. the toilet as left to the original is a little scary with an open shelf and detergent bottles strewn all over.
left at 5.45pm to go for the dFMA class at bca, it was nice to have the sun on my face.
Monday, 14 August 2017
Subscribe to:
Post Comments (Atom)
Last days of June
Haven't cycled sinced March, when L left, and the bicycle was packed in the bag. to midyear, thats 3 months. probably the period that i...
-
Eventful day, started at 9am when S came around to pick us all in sequence. Public consultation was at Pasir Ris block 614 and then the oth...
-
TextAlign Tool Aligns it to specific pt or distance. either by aligning the selected one to the last one. or by clicking options, the ...
-
Today is about Ground Gardens and Sky Terraces and what encourages their proliferation in our city. In the same way that if there isn't...
No comments:
Post a Comment